欧美一区二区三区婷婷月色_亚洲精品无码av久久久久久_亚洲色无码专区一区_首页av在线_中国老少配videos_91碰碰碰

Hello, welcome to Zhuo for air conditioning electromechanical official website!

_Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd

Industry news

Prevention of clean room fire must be points

Author: Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd
Published:2017-09-18 16:08:19Views:2100SML

Electronic industry class clean plant particularity and fire risk, building fire protection design should pay attention to the following six points:
Text label:
Electronic industry class clean plant particularity and fire risk, building fire protection design should pay attention to the following six points:

First, fire water supply and fire fighting equipment
1, clean room production layer and the upper and lower technology plus layer (excluding non-access to the technical sandwich), should be set up indoor fire hydrant. Fire hydrant water consumption of not less than 10L / s, each water gun water should be not less than 5L / s.
2, clean plant with precious equipment, equipment, rooms should be set up a fixed fire fighting facilities. When setting up automatic sprinkler system, it is advisable to use pre-acting automatic sprinkler system. When setting up gas fire extinguishing system, it should not use fire extinguishing agent which can cause suffocation and secondary damage to the protection object.

Second, fire communication facilities
As a result of a large number of clean room indoor use of metal sheet, the general shielding effect is very strong. So in the clean room should be set up a complete set of fire communication facilities. This facility is not only used by internal workers in the event of a fire alarm and communication, but should also be used by fire officers and soldiers involved in fire fighting to ensure that fire communication is smooth and that unnecessary communication interruption and communication failures are reduced to ensure the safety of firefighters The

Third, fire separation
1, clean plant fire rating should not be lower than two.
2, clean plant floor number to determine: due to process requirements, the level of clean room is generally higher than the average plant, and the need to set up and down the technical sandwich or technical lanes, mezzanine set some equipment, fans, ducts, cables, Of the pipeline. It is connected with the clean area by the hollow floor, ceiling or complex pipe connected up and down. If the technical sandwich as a separate layer, fire separation is obviously very difficult, I learn from the views of experts that the upper and lower technical mezzanine and production areas as a layer to consider, but should be set up in the upper and lower mezzanine corresponding fire facilities.
3, clean the plant's fire partition. As the process needs, production workshop production line length of 200 meters, in accordance with the "civil building design fire safety regulations," the requirements of the fire partition is completely unrealistic. In view of the small number of employees in such industries, if the safety evacuation conditions and fire extinguishing facilities are installed, fire prevention zones can be set up according to production requirements.

Fourth, the safe evacuation channel
1, safe exit and evacuation channel: In the clean plant design, the staff of the safe evacuation is particularly important, but also more complex. Should be in accordance with the "clean plant design specifications" requirements of each production layer, each fire zone or the number of safe areas of each clean area should not be less than two, and the safety of exports should be scattered layout. Design should try to separate the evacuation route and process to meet the production site from any one to the safe exit without twists and turns of personnel purification path, should be clear to avoid twists and turns, and embarked on a clear indication of the set.
2, the requirements of the fire to save the entrance: the clean room is a closed room, in the event of a fire, to the firefighters to save the difficulties, so the requirements of the clean room should be provided for the firefighters to the clean room cleaning area dedicated fire Mouth, fire mouth spacing of not more than 80m, the width should not be less than 750mm, the height of not less than 1900mm, there should be a clear sign, the fire can usually be closed, the use of firefighters from the outdoor open. Designed in the factory fire fighting door should be set up in the staircase or evacuation walkway, to ensure the safety of firefighters themselves.

Fifth, ventilation and smoke control
1, flammable, explosive area of the exhaust should be separated from the general area, set up separately, and select the explosion-proof exhaust fan.
2, in order to ensure the safety of production and staff safety, should set the accident exhaust system. The exhaust system should be equipped with automatic and manual control switch, manual control switch should be located in the clean room and clean outdoor easy to operate the location.
3, clean the corridor of the plant, should be set up mechanical smoke control facilities. Clean the plant more types of pipelines, if a set of smoke prevention and drainage pipe has a great difficulty, clean room mechanical smoke system can be ventilated, clean air conditioning system combined, but must take a reliable fire safety measures.
4, the duct should be non-combustible materials, and in accordance with the requirements of the relevant specifications set fire valve.

Sixth, electrical
1, clean plant should be set for personnel evacuation with emergency lighting and evacuation signs. In the fire mouth should be set to red emergency lights.
2, clean plant should be set aside to meet the needs of the premises or parts of the activities and work required for the minimum illumination, generally should not be less than the normal illumination of the standard 1/10.
3, clean plant production area (including technical mezzanine), room, station, etc. should be set fire alarm detector. Clean plant production area and corridor should be set to manual fire alarm button.
4, clean room may produce electrostatic hazards of equipment, mobile liquid, gas or powder pipeline should take anti-static grounding measures.
2017-09-18

行業工程

最新資訊

聯系我們

Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd
聯系人:
手機:400-0000-826
電話:
傳真:
地址:

Copyright (C) 2017 All rights Reserved. Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd. All rights reserved   粵ICP備001號  

Website statistics  |   Sitemap  

主站蜘蛛池模板: 免费无遮挡色视频网站 | 成人国产第区在线观看 | 激情亚洲婷婷 | 成年黄页网站大全免费 | www.一级黄色片 | 视频国产在线观看 | 日韩av高清免费在线观看 | 午夜影视免费片在线观看 | 国产99免费视频 | 免费高潮视频95在线观看网站 | 水中色av综合 | 国产日韩欧美网站 | 欧美一区2区三区3区公司 | aⅴ视频在线免播放观看 | 超碰人人草人人 | 成人看毛片 | 日本3级片 | 亚洲经典国产欧美 | 日韩欧美在线视频播放 | 少妇叫床视频 | 91欧美精品在线 | 国产成人无码区免费A∨视频网站 | 欧美躁天天躁无码中文字 | 天堂在线中文av | 亚洲中文字幕日产乱码高清 | 国产精品视频一二三四区 | 成在人线AV无码免观看蜜芽 | 性色在线视频 | 日本ww色 | 香蕉私人影院 | 国语对白做受xxxxx在线 | 日韩av黄色 | 神马久久春色视频 | 91视频精品| 亚洲拍拍拍 | 亚洲综合色自拍一区 | 四虎最新紧急更新地址 | 亚洲中文字幕久久精品无码A | 午夜视频在线播放 | 巜被社长侵犯的人2中文在线 | 中文字幕在线观看网址 |